[ Post a Reply | Next | Previous | Up ]
 

Re: Blough

From: Ray Bawal, Jr.
Location: St. Clair, MI
email: r_bawal@inlandexpressions.com
Remote Name: 207.148.202.254
Date: 12.08.08
Time: 10:14:20 AM

Comments

The forward section of the Blough was built minus her forward ballast tanks, due to drydock restrictions at the time. When a new drydock was completed the stern section was built to it's full width with the bow section being joined with the stern section in the new drydock. There the forward ballast tanks were installed giving the bow section it's 105 foot width.

compasshr.gif (2701 bytes)

Return to the Great Lakes & Seaway Shipping home page
Copyright Boatnerd.com  All Rights Reserved.
This material may not be published, broadcast, rewritten or redistributed.
Terms of use
             Instructions/FAQ