[ Post a Reply | Next | Previous | Up ]
 

Sherwin "Tail shaft"

From: JCR
Location:
email:
Remote Name: 98.224.250.139
Date: 11.28.08
Time: 11:46:22 AM

Comments

I see on the News page that the Sherwin has been moved into the drydock at Bayship for the removal of the "tail shaft." What is included in the tail shaft and is it being replaced? Does this mean work is still proceeding on the Sherwin conversion just at a slower rate thanks to the economy and the priority put on getting the Beeghly repowered ASAP?

compasshr.gif (2701 bytes)

Return to the Great Lakes & Seaway Shipping home page
Copyright © Boatnerd.com  All Rights Reserved.
This material may not be published, broadcast, rewritten or redistributed.
Terms of use
             Instructions/FAQ